top of page

Commercial

EAA Exhibition Hall Addition
Oshkosh, WI

Size:3,840 s.f.

 

This pre-engineered metal structure houses 48 new sanitary fixtures to serve the thousands of visitors that enjoy EAA AirVenture every year.

 

Architect:

     William F. Hoch

 

General Contractor:

     M.P.B. Builders, Inc.

American Legion
Post 306 
Green Lake, WI
 

Size: 5,200 s.f.

 

Green Lake post members and the community banded together to fund this new wood frame structure that will serve as both the American Legion post and a community gathering place.

 

Architect:

     William F. Hoch

General Contractor:

     M.P.B. Builders, Inc.


 

Cove Marine Boat Storage
Princeton, WI
 

Size: 11,708 s.f.

 

Green Lake vacationers will be able to store their boats during the winter months in this new pre-engineered structure.

 

Architect:

     William F. Hoch

General Contractor:

     M.P.B. Builders, Inc.


 

Vogel Bros. Building Co.
Corporate Office
Madison, WI

Size: 14,000 s.f.

 

This conventionally framed steel structure includes elements of Prairie Style design with a façade composed of brick, synthetic plaster and glazing.  The building has been situated on the site to maximize the views of the adjacent wooded areas for the occupants of the structure.  The glazing will allow an abundance of natural light to penetrate into all of the occupied areas of the building as well as provide a connection to the flora and fauna adjacent to the building.  Principles of design consistent with the U.S. Green Building Council’s LEED rating system have been incorporated.

 

Architect:

     William F. Hoch

General Contractor:

     Vogel Bros. Building Co.

Woodland Resort
Devils Lake, ND

Size: 24,405 s.f.

 

This wood framed structure added 10 "Legendary Suites" and a new retail sales area to the Woodland Resort compound along the shores of Devils Lake.

 

Architect:

     William F. Hoch

Design Architect

     Curtis Schroeder

General Contractor:

     Consolidated Construction Company, Inc.

bottom of page